1949 Seagrave Restoration Project: Phase 1

picture

First, many pictures of the truck were taken to help with re-assembly.

Next, the truck was stripped of floorboards, fenders, tailboard, running boards, hose reel, and various other components.

picture
picture

A truck crane was used to remove the body, in two pieces...

...Leaving a heavy-duty Seagrave cab and chassis.

picture
picture

Now, the real work begins!


SPAAMFAA Logo

bottom