1942 Mack Restoration Project: Phase 4

After some hardening time, the cab is very carefully put back on.

42 Mack restoration


The cab and chasis are then pushed back into the shed.

42 Mack restoration

The body is then sandblasted and made ready for sanding.

42 Mack restoration

42 Mack restoration

The body is then primed, sanded, masked, and painted.

42 Mack restoration

42 Mack restoration

After some hardening time, the crane is used to mount the pump compartment, frame, and body. Then everything goes back inside.

42 Mack restoration

42 Mack restoration

Next begins the cab and engine assembly, dash board, floor mats, seats, air filter, solenoids, throttle linkage, what seems to be about a million miles of wire, and lots of connections..

42 Mack restoration

42 Mack restoration

42 Mack restoration

Phase 1   Phase 2   Phase 3   Phase 4   Phase 5

SPAAMFAA Logo

bottom